Bernina Bernette 12 Instruction Manual Page 9

  • Download
  • Add to my manuals
  • Print
  • Page
    / 80
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 8
Before connecting the power supply, make
sure that the voltage and frequency shown
Place the machine on a stable table.
1. Connect the power line cord to the
machine by inserting the 2-hole plug into
the
2. Connect the power line plug to the wall
outlet.
3. Turn on the power switch.
4. The sewing lamp will light up when the
switch is turned on.
on the rating plate is conforming with your
mains power.
mains plug socket.
With the sewing machine turned off, insert
the foot control plug into its connector on the
sewing machine.
Turn on the sewing machine, and then
slowly depress the foot control to start
sewing. Release the foot control to stop the
sewing machine.
Caution:
Always make sure that the machine is
unplugged from power source and the main
switch is on "O". when the machine is not in
use and before inserting or removing parts.
Attention:
Consult a qualified electrician if in doubt as
how to connect the machine to the power
source. Unplug the power cord when the
machine is not in use.
Use only foot controller type C-9000
manufactured by CHIEN HUNG TAIWAN.,
LTD. with sewing machine model 20 and 25.
Polarized plug information
This appliance has a polarized plug (one
blade wider than the other), to reduce the
risk of electrical shock; this plug will fit in a
polarized outlet only one way. If the plug
does not fit fully in the outlet, reverse the
plug. If it still does not fit, contact a qualified
electrician to install the proper outlet. Do not
modify the plug in any way.
Connecting the Machine
Foot Control
Machine Setup
8
502020.75.28_021H2D0101_1010_IM_bernette 20 25_EN
Page view 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 79 80

Comments to this Manuals

No comments